In short: After Lakemont's 2008 bankruptcy, a new company, LD Lots, bought about 200 finished and 256 "paper" lots out of foreclosure and sold them to Silverado Homes. Silverado finished building DVCA, Village 9 off the Palmer roundabout, and part of Point Legado, and it controls Legado HOA as declarant. Its next two villages, 10 and 14 (roughly 250 to 330 homes), can only be reached by Palmer Drive and cannot start until Legacy 49 builds the sewer lift station. The committee wanted Silverado to pay a facility fee like RED; a deal was discussed but never put in writing.
Start here: COC notes with Silverado, July 2024 ↗ · Research guide: the developers, p. 3
What the records say
- "LD Lots (2012-Present) is a 'separate' company that purchased the 200 improved and 256 paper lots from foreclosure … LD Lots would sell exclusively to Silverado Homes." Research guide, p. 3
- "The Legado Villages are land-locked, and lone access is via Palmer. They will have their own electronic gates to their villages." COC Activity Review, p. 2 ↗
- Silverado "cannot commit to any requests from DVCA without going back to Silverado senior management and owners." COC Activity Review, p. 4 ↗
- Silverado stopped paying the $1,000 "lot impact fee" at escrow sometime between 2014 and 2022. COC History, p. 5 ↗
- By hand count of the 2005 plan, Village 10 has 117 homes and Village 14 has 210. COC pitch deck, p. 3 ↗
Timeline
- 2012–2015: LD Lots and Silverado take over the lots and the declarant rights. Declarant assignment #513916, 2013 · #541764, 2015
- 2020: declarant rights to more DVCA and Legado lots pass to Silverado. Research guide, p. 4
- 2022: the last four homes on Stonehaven Court are built, and the construction trucks damage the road. Newsletter, Aug 2022, p. 5 ↗
- January 2024: Silverado stops paying for landscaping it used to cover. Newsletter, Jan 2024 ↗
- April 2024: Silverado repairs the Legado wastewater filter off Palmer. Nextdoor
- July 2024: the committee's questions for Silverado: a per-lot fee, Palmer maintenance fees from Legado HOA, and transfer of the drainage lots. COC notes with Silverado, p. 2 ↗ · COC developers meeting (about 0:38) ↗
- 2024: "the committee has decided to delay any workshop with Silverado" until Legacy 49's sewer work is settled. COC summary, p. 4 ↗
- 2025: Ron: the committee had "a tentative deal for no less than $200,000 from Silverado." Nextdoor
Open questions
- Whether Silverado still owes the $1,000 lot impact fee for homes built after it stopped paying.
Search words: Silverado · Silverado Homes · Silverado Dayton Valley · LD Lots · Mike Evans · Village 9 · Village 10 · Village 14 · Palmer roundabout · Point Legado · paper lots · improved lots · lot impact fee · $1 · 000 · declarant · sewer lift pump · Stonehaven damage